You are here: Home » Cooling Tower Part » Cooling Tower Fill » BAC Cooling Tower Fill Media

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

BAC Cooling Tower Fill Media

  • ZR-L13

  • PT

  • 10 days

Availability:

BAC Cooling Tower Fill Media Overview

BAC cooling tower fill media is a critical component designed to maximize water-air contact, enhancing heat dissipation efficiency in cooling towers. Engineered for superior thermal performance and durability, it ensures reliable operation across various industrial applications. Regular inspection and timely replacement are essential to maintain optimal cooling efficiency.

BAC Cooling Tower Fill Media Design     BAC Cooling Tower Fill Media Structure     BAC Cooling Tower Fill Media Installation

BAC Cooling Tower Fill Media Specifications

BAC fill media is customizable to meet specific requirements, including length, width, material, and thickness. Options for flame-retardant or antibacterial properties are available. Contact us with your needs for a tailored solution and quotation.

BAC Cooling Tower Fill Media Enhanced Design

Width (mm) Height (mm) A (mm) B (mm) C (mm) D (mm) F (mm) Gap (mm) Angle
1500 1050 255 180 260 985 290 15 13°
1250 1050 255 180 260 735 290 15 13°

Material Options

Available in PVC, PP, or CPVC for durability and compatibility.

Thickness Options

Standard thickness of 0.32mm, customizable with a minimum order of 3,000 pieces.

Customization Options for BAC Cooling Tower Fill Media


  • Custom logo (Min. order: 3,000 pieces)

  • Custom packaging (Min. order: 3,000 pieces)

  • Graphic customization (Min. order: 3,000 pieces)

When to Replace BAC Cooling Tower Fill Media


Timely replacement of fill media is critical to maintain cooling tower efficiency. Key indicators include:

Aging and Wear

  • Surface degradation reduces performance.

  • Replace every 5–8 years with maintenance, or 2–3 years without.

Contamination and Blockage

  • Sediment or bacterial buildup restricts airflow and cooling.

  • Poor water quality necessitates replacement.

Loosening and Detachment

  • Vibration or water impact causes structural issues, reducing efficiency.

Increased Resistance

  • Blockages increase fan energy consumption.

Reduced Cooling Efficiency

  • Damaged fill leads to high water temperatures and equipment strain.

Maintenance and Inspection

  • Inspect every 1–2 years to prevent leaks.

  • Replace if cleaning fails to restore performance.

Environmental and Operating Conditions

  • Harsh conditions accelerate wear, requiring frequent checks.

  • Adjust replacement based on water quality and load.

Economic Considerations

  • Replace to maintain yield and cost-efficiency.

Key Features of BAC Cooling Tower Fill Media


  • Enhanced Thermal Performance: Improves cooling efficiency by 7.3% with patented design.

  • Easy Inspection and Cleaning: Allows maintenance without disassembly.

  • Self-Extinguishing PVC: Resists decay and biofouling, suitable for temperatures below 50°C.

  • Mechanical Assembly Option: Available for select products.

Advantages

  • Superior Thermal Performance: Optimizes water and air flow for maximum efficiency.

  • Efficient Installation: Includes tailored kits with support structures and hardware.

  • Low Maintenance Costs: Corrosion and biofouling resistance extends service life.

  • Strong Adaptability: Compatible with BAC S3000, FXV, and other crossflow models.

  • Integrated Design: Eurovent-certified drift eliminators and louvers enhance performance.

  • Energy-Saving: Reduces fan energy consumption for lower operating costs.

Applications of BAC Cooling Tower Fill Media


BAC fill media is used in industries including:

  • Industrial water cooling

  • Air compressors

  • Aluminum profile processing

  • Steam turbines

  • Power generation

  • Tanneries

  • Electric furnaces

  • Freezing systems

  • Air conditioning cooling systems

BAC Cooling Tower Fill Media Applications

Size Measurement for BAC Cooling Tower Fill Media


Accurate measurements ensure compatibility with your cooling tower. Refer to the diagram below for precise sizing.

BAC Cooling Tower Fill Media Size Measurement Guide

Packaging and Shipping


Packaging

Packaged in bundles, on wooden pallets, or customized per request.

Delivery Time

Shipped within 10 days.

BAC Cooling Tower Fill Media Shipment

Our Services for BAC Cooling Tower Fill Media


Pre-Sale Services

We provide product images, videos, quotations, and engineering drawings tailored to your needs. Factory visits are welcome.

Sale Services

  • Production schedule updates with photos.

  • 24/7 support via phone, email, or online services.

  • On-site installation guidance and training available.

After-Sale Services

12-month warranty with ongoing support to ensure optimal performance.

About PT


With over 20 years of experience, PT is a trusted global supplier of cooling tower components. Our expertise ensures high-quality, reliable solutions for industries worldwide. Request a Quote to explore how we can meet your cooling needs.

Frequently Asked Questions (FAQ)


What is the function of BAC cooling tower fill media?

It increases water-air contact to enhance heat dissipation in cooling towers.

What materials are used for BAC fill media?

PVC, PP, or CPVC, with optional flame-retardant or antibacterial properties.

Can BAC fill media be customized?

Yes, logos, packaging, and graphics can be customized with a minimum order of 3,000 pieces.

What is the lifespan of BAC fill media?

Over 5 years with proper maintenance, due to corrosion and biofouling resistance.

What industries use BAC fill media?

Chemical, power, metallurgy, HVAC, and more.

How does BAC fill media improve cooling efficiency?

Patented design enhances thermal performance by 7.3% through optimized water and air flow.

How is BAC fill media installed?

Using tailored installation kits for quick and efficient setup.

What is the delivery time for BAC fill media?

Orders are delivered within 10 days.

Why Choose PT for BAC Cooling Tower Fill Media?


  • Premium Quality: Made with imported raw materials for durability.

  • Competitive Pricing: Flexible pricing tailored to market demands.

  • Expertise: Over 20 years of experience in cooling tower solutions.

  • Superior Service: Comprehensive support with a 12-month warranty.

Previous: 
Next: 
Consult Your Cooling Tower Expert
Cooling Tower Parts
COOLING TOWER PARTS SUPPLIER
OEM Brands
Quick Links
COOLING TOWER PARTS SUPPLIER
Cooling Tower Parts
OEM Brands
Quick Links
COPYRIGHT © 2024 ZHEJIANG AOSHUAI REFRIGERATION CO., LTD. ALL RIGHTS RESERVED.