You are here: Home » Blog » Company News & Cases » SGS Test Report Confirms RoHS Test Compliance of Our PP Cooling Tower Fill

SGS Test Report Confirms RoHS Test Compliance of Our PP Cooling Tower Fill

Views: 0     Author: Cindy     Publish Time: 2026-10-26      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button


cooling tower fill banner

At Power Tower Cooling Technology (Shaoxing) Co., Ltd., product quality, material evaluation, and customer confidence are essential to our commitment to cooling tower solutions. We are pleased to share the results of an independent SGS test report for our polypropylene (PP) film cooling tower fill sample.

According to SGS Test Report No. NGBEC26009488601, dated October 23, 2026, the tested PP film sample passed the specified testing requirements under the EU RoHS Directive (EU) 2015/863, which amends Annex II to Directive 2011/65/EU.

This test result provides documented information about the tested material and demonstrates our commitment to transparent product documentation. For customers sourcing cooling tower fill, third-party test reports can be a useful part of evaluating materials and selecting suitable suppliers.

SGS Test Report.pdf

SGS Test Report for Our PP Cooling Tower Fill

SGS is a globally recognized testing, inspection, and certification organization. Independent laboratory testing helps businesses evaluate materials against specified test requirements and provides supporting documentation for purchasing and quality assessments.

For this assessment, the sample was identified as PP Film, with the tested part described as black film. The testing was conducted by SGS-CSTC Standards Technical Services (Ningbo) Co., Ltd.

The report provides the following information:

  • Company name: Power Tower Cooling Technology (Shaoxing) Co., Ltd.

  • SGS test report number: NGBEC26009488601

  • SGS job number: NBP26-011444

  • Sample name: PP Film

  • Sample description: Black film

  • Sample receiving date: October 20, 2026

  • Testing period: October 20–23, 2026

  • Report date: October 23, 2026

  • Testing requirement: EU RoHS Directive (EU) 2015/863

  • Test conclusion: Pass

According to the report, the sample and related information were provided by the client. The reported conclusion applies to the specific sample tested under the conditions described in the report.

cooling Tower Fill Packing

What Is the EU RoHS Directive?

RoHS stands for Restriction of Hazardous Substances. The European Union's RoHS framework restricts certain hazardous substances in electrical and electronic equipment within its scope.

The SGS report evaluated the specified PP film sample against the substance restrictions listed under EU RoHS Directive (EU) 2015/863. The assessment covered ten restricted substances or substance groups, including heavy metals, brominated flame retardants, and certain phthalates.

The tested substances included:

  • Lead (Pb)

  • Mercury (Hg)

  • Cadmium (Cd)

  • Hexavalent chromium (Cr(VI))

  • Polybrominated biphenyls (PBB)

  • Polybrominated diphenyl ethers (PBDE)

  • Bis(2-ethylhexyl) phthalate (DEHP)

  • Butyl benzyl phthalate (BBP)

  • Dibutyl phthalate (DBP)

  • Diisobutyl phthalate (DIBP)

The report records a Pass conclusion for the requested testing. In the detailed results, the listed substances and relevant substance groups were reported as ND, meaning not detected above the applicable method detection limits.

This result provides customers with specific, report-based information about the tested sample. It is important to distinguish a successful test against specified RoHS requirements from a general product certification or a declaration that every product manufactured by a company meets the same requirements.

Why Is Material Testing Important for Cooling Tower Fill?

Cooling tower fill is a key component in evaporative cooling systems. It increases the contact area between water and air, helping promote heat and mass transfer so that heat can be released from circulating water.

Because cooling tower fill operates in environments involving continuous water circulation, airflow, and temperature changes, selecting appropriate materials is important. Buyers need to consider material characteristics, product design, operating conditions, and available technical documentation.

1. Independent Testing Provides Supporting Evidence

A third-party laboratory report provides documented evidence of the results obtained from a specific sample under defined testing conditions.

For purchasing teams, this information can support supplier assessments, technical reviews, and internal quality documentation.

2. Greater Transparency for International Buyers

International buyers often need clear information about the materials used in industrial products. A detailed test report identifies the sample, testing requirements, methods, and results, helping buyers understand exactly what was evaluated.

At Power Tower Cooling Technology (Shaoxing) Co., Ltd., we recognize the importance of making relevant product information available to customers evaluating cooling tower components.

3. Documentation Supports Supplier Qualification

When comparing cooling tower fill suppliers, buyers may review material test reports alongside product specifications, manufacturing information, quality-control procedures, and other relevant technical documents.

The SGS report for our PP film sample adds an independent test record to the documentation available for evaluating this material.

4. More Informed Purchasing Decisions

A purchasing decision should consider more than the initial product price. Buyers should also evaluate the intended application, fill configuration, water quality, maintenance requirements, and the suitability of the material for the operating environment.

Appropriate technical documentation helps customers make decisions based on project requirements rather than assumptions.

Applications of PP Film for Cooling Tower Fill

PP Cooling Tower Fill for Industrial Cooling Applications

Polypropylene (PP) is used in a wide range of industrial applications because of its useful material properties. PP film can be formed into cooling tower fill structures designed to increase the contact area between water and air.

However, the performance of a specific PP cooling tower fill product depends on more than the base material alone. Product geometry, sheet thickness, manufacturing quality, installation, water quality, and operating conditions can all affect suitability and performance.

When selecting PP cooling tower fill, buyers should consider the following factors.

Cooling Tower Type and Configuration

Cooling tower fill designs vary according to the tower's airflow and water distribution arrangement. Crossflow and counterflow cooling towers may require different fill configurations and dimensions.

The selected fill should match the cooling tower's original design or the requirements of the replacement project.

Operating Conditions and Water Quality

Water temperature, circulating water flow, suspended solids, mineral content, and biological growth can affect fill selection and maintenance requirements.

For systems with a higher risk of fouling, buyers should evaluate the fill design and its suitability for the actual water conditions.

Fill Dimensions and Installation Requirements

Correct dimensions and configuration are important for installation and water distribution. Before ordering replacement fill, buyers should verify the required dimensions, layout, and compatibility with the existing cooling tower.

Material Documentation

Available technical documents may include material specifications, product drawings, test reports, and relevant quality records.

The SGS report discussed in this article concerns the specified RoHS-related substances in the tested PP film sample. It does not independently establish thermal performance, cooling efficiency, mechanical strength, service life, or suitability for every industrial application. These characteristics should be evaluated separately using relevant technical data and testing where necessary.

Our Commitment to Product Quality and Customer Confidence

At Power Tower Cooling Technology (Shaoxing) Co., Ltd., we understand that customers need reliable information when sourcing cooling tower fill and related components.

We believe that clear product information and relevant technical documentation help build confidence between manufacturers and customers. Independent testing is one way to provide additional information about material characteristics and specified compliance requirements.

The SGS test report dated October 23, 2026, records a Pass conclusion for the requested EU RoHS-related testing of our PP film sample. We are pleased to share this result as part of our commitment to transparent product evaluation and customer support.

At the same time, we recognize that different projects and markets may have different documentation requirements. Customers should confirm whether a particular test report applies to the exact product and material they intend to purchase.

Our team can help customers review product details and identify the relevant technical information for their cooling tower applications.

How to Choose a Reliable Cooling Tower Fill Supplier

Choosing a supplier involves evaluating product suitability, documentation, manufacturing capabilities, and technical support.

Here are several practical points buyers should consider.

Review Product Specifications

Confirm the material, dimensions, fill configuration, and intended application before placing an order. For replacement projects, check compatibility with the existing cooling tower.

Request Relevant Test Reports

Ask suppliers for available material test reports and verify the sample descriptions, report dates, testing scope, and conclusions. Ensure that the documents correspond to the product being evaluated.

Evaluate Application Suitability

Consider the operating water temperature, water quality, cooling requirements, and maintenance conditions. A material or fill design suitable for one system may not be the best choice for another.

Confirm Technical Support

A supplier should be able to clarify product information and help customers identify the details required for project evaluation.

By considering these factors together, buyers can make more informed decisions when sourcing cooling tower fill for industrial and HVAC applications.

Frequently Asked Questions About Our SGS Test Report

Did Our PP Cooling Tower Fill Sample Pass the SGS Test?

Yes. SGS Test Report No. NGBEC26009488601, dated October 23, 2026, records a Pass conclusion for the specified testing under EU RoHS Directive (EU) 2015/863.

Which Material Was Tested?

The report identifies the sample as PP Film and describes the tested part as black film.

Which Substances Were Tested?

The test covered lead, mercury, cadmium, hexavalent chromium, PBB, PBDE, DEHP, BBP, DBP, and DIBP, as specified in the report.

Does the Report Apply to All Our Cooling Tower Fill Products?

Not automatically. The report applies to the specific sample identified in the document. Customers should confirm the relationship between the tested sample and the exact product or production batch they intend to purchase.

Does Passing the RoHS Test Mean the Fill Has Been Certified for All Applications?

No. The report documents the results of specified substance testing. It should not be interpreted as a blanket certification of all company products or as proof of cooling performance, service life, or suitability for every operating condition.

Can I Request More Information About PP Cooling Tower Fill?

Yes. Customers can contact our team to discuss their application requirements, product specifications, and available technical documentation.

Contact Power Tower Cooling Technology for Cooling Tower Fill Solutions

If you are sourcing PP cooling tower fill for a new installation, a replacement project, or an existing industrial cooling system, our team is ready to discuss your requirements.

We welcome inquiries from cooling tower manufacturers, contractors, distributors, maintenance providers, and industrial end users seeking relevant product information and technical documentation.

Visit our official website to learn more about our cooling tower fill products and available solutions.

Company: Power Tower Cooling Technology (Shaoxing) Co., Ltd.

Website: https://www.coolingtowerpart.com

Final Note: Our SGS test report provides documented evidence that the specified PP film sample passed the requested RoHS-related testing. For product selection and project compliance, customers should confirm the applicable documentation and technical requirements for their specific application.


CONTACT US
Consult Your Cooling Tower Expert
Cooling Tower Parts
COOLING TOWER PARTS SUPPLIER
OEM Brands
Quick Links
COOLING TOWER PARTS SUPPLIER
Cooling Tower Parts
OEM Brands
Quick Links
COPYRIGHT © 2024 ZHEJIANG AOSHUAI REFRIGERATION CO., LTD. ALL RIGHTS RESERVED.