Views: 0 Author: Site Editor Publish Time: 2025-09-11 Origin: Site
Cleaning an EVAPCO cooling tower is important for efficiency, water quality, and extending equipment life. The process can vary slightly depending on whether you have an open circuit, closed circuit, or hybrid tower, but the general cleaning steps are similar. How To Clean Evapco Cooling Tower? Here’s a practical guide:
Step-by-Step Cleaning Procedure for EVAPCO Cooling Towers
1. Preparation
Shut down the system: Turn off the fan and pump. Lock out/tag out for safety.
Drain the basin: Open the basin drain valve to remove water.
Wear PPE: Gloves, goggles, and possibly a mask (to protect from scale dust or biological growth).
2. Debris Removal
Remove large debris: Clean out leaves, dirt, and trash from the basin.
Vacuum sludge: Use a wet vac or pump to remove sediment from the basin floor.
3. Cleaning Fill, Drift Eliminators & Louvers
Access internal parts: Open access panels.
Inspect fill: Look for scale, biofilm, or algae buildup.
Low-pressure wash: Use a low-pressure hose (not high pressure—this can damage PVC fill) to rinse fill, drift eliminators, and louvers.
Chemical cleaning (if needed):
Use a cooling tower cleaner/descaler compatible with EVAPCO (typically non-acidic scale removers or biocides).
Apply chemical solution and allow it to soak per manufacturer’s instructions.
Rinse thoroughly.
4. Basin & Distribution System
Scrub the basin: Use brushes with mild detergent or scale remover.
Check spray nozzles: Remove and clean clogged nozzles with a descaling solution or soak in vinegar-based cleaner.
Flush piping: Ensure water distribution lines are free from scale and slime.
5. Disinfection
Apply an EPA-approved biocide or chlorine treatment to kill bacteria and algae (especially important to control Legionella).
Follow EVAPCO’s guidelines for water treatment and disinfection.
6. Inspection & Reassembly
Check mechanical parts: Inspect fan blades, gearbox, belts, and bearings.
Inspect drift eliminators and fill for cracks or warping. Replace if damaged.
Reinstall cleaned parts and close access panels.
7. Refill & Restart
Refill with clean water.
Check water chemistry: Adjust with proper water treatment (pH, conductivity, biocides, corrosion inhibitors).
Restart system and observe water distribution and fan operation.
Recommended Cleaning Frequency
Light cleaning: Every 1–3 months (depending on water quality and load).
Deep cleaning & disinfection: At least twice per year (spring start-up and fall shut-down).
Emergency cleaning: After visible algae, scaling, or fouling.
PT Company have kinds of evapco cooling tower parts, can meet your needs for ecapco cooling tower.
Cooling Tower Fill | Cooling Tower Fan | Cooling Tower Speed Reduer | Cooling Tower Motor | Cooling Tower Drift Eliminator | Cooling Tower Fan Stacks | Cooling Tower Sprinkler Head | Cooling Tower Air Inlet Louver | Cooling Tower Basin | Cooling Tower Casing | Cooling Tower Nozzle | Cooling Tower Spray Pan | Cooling Tower Plastic Accessories
Marley/Spx | Liang Chi | Kingsun | EBABA/Shinwa | Spindle | Kuken | BAC | Brentwood | Evapco | Royden
HOME | PRODUCTS | OEM BRANDS | ABOUT US | BLOG | FAQ | CONTACT US
Cooling Tower Fill Cooling Tower Fan Cooling Tower Speed Reduer Cooling Tower Motor Cooling Tower Drift Eliminator Cooling Tower Fan Stacks Cooling Tower Sprinkler Head Cooling Tower Air Inlet Louver Cooling Tower Basin Cooling Tower Casing Cooling Tower Nozzle Cooling Tower Spray Pan Cooling Tower Plastic Accessories