BAC (Baltimore Aircoil Company) cooling tower maintenance and repair is essential to keep thermal performance, minimize downtime, and extend equipment life. Below is a practical, field-oriented guide aligned with BAC crossflow and counterflow towers.


1. Preventive Maintenance Schedule (BAC Best Practice)


Daily / Weekly Bac Cooling Tower Maintenance And Repair


* Check cold-water basin level

* Inspect for unusual noise or vibration

* Verify fan motor amps (compare to nameplate)

* Observe water distribution (no dry fill areas)


Monthly Bac Cooling Tower Maintenance And Repair


* Inspect spray nozzles / distribution deck

* Check make-up water valve operation

* Inspect drift eliminators for damage or gaps

* Look for visible corrosion or leaks


Quarterly Bac Cooling Tower Maintenance And Repair


* Clean basin strainers

* Inspect fan blades for cracks or fouling

* Check gearbox oil level & condition

* Verify vibration levels at motor and gearbox

* Inspect fill for scaling or biological growth


Semi-Annual Bac Cooling Tower Maintenance And Repair


* Lubricate:


 * Motor bearings

 * Fan shaft bearings (if applicable)

* Check fan blade pitch angle

* Inspect couplings and alignment

* Test motor insulation resistance (megger)


Annual (Major Inspection) Bac Cooling Tower Maintenance And Repair


* Drain and clean cold-water basin

* Remove and clean spray nozzles

* Inspect distribution deck panels

* Inspect drift eliminators thoroughly

* Check gearbox oil (change if contaminated)

* Inspect structural members and casing

* Verify tower performance vs design


2. Key BAC Components: Maintenance & Repair


2.1 Water Distribution System


Common issues:


* Clogged nozzles

* Uneven water flow

* Deck sagging (crossflow)


Repair actions:


* Replace damaged nozzles

* Level distribution deck panels

* Maintain correct basin water depth


2.2 Fill Pack


Problems:


* Scaling

* Biofouling

* Brittleness (UV/age)


Solutions:


* Chemical cleaning (with water treatment vendor)

* Partial or full fill replacement

* Upgrade to higher-efficiency BAC-compatible fill


2.3 Drift Eliminators


Failure signs:


* Excessive water carryover

* Cracked or warped blades


Repair:


* Replace entire panel sections

* Ensure tight sealing to prevent air bypass


2.4 Fan, Gearbox & Drive System


Fan


* Check blade balance and pitch

* Clean fouling to prevent vibration


Gearbox


* Use manufacturer-approved oil

* Watch for oil leaks and temperature rise


Motor


* Ensure space heaters operate

* Replace corroded conduit fittings

* Verify VFD parameters if installed


3. Typical BAC Cooling Tower Repairs



Repair Type Typical Interval
Nozzle replacement 2–5 years
Drift eliminator replacement 8–15 years
Fill replacement 5–12 years
Gearbox overhaul 8–15 years
Fan motor replacement 10–20 years
Basin re-coating   s required


4. Water Treatment (Critical for BAC Towers)


Proper water chemistry prevents 80% of mechanical failures.


Key control items:


* Scaling index (LSI)

* Biological growth

* Corrosion inhibitors

* Blowdown control

* Side-stream filtration (recommended)


5. Shutdown, Repair & Start-Up Checklist


Before Shutdown


* Record motor amps, vibration, temperatures

* Photograph blade pitch and component positions


During Repair


* Use OEM or BAC-approved equivalent parts

* Replace fasteners with stainless steel

* Maintain original airflow and water distribution geometry


Start-Up


* Verify rotation direction

* Check fan blade pitch

* Monitor amps, vibration, noise for first 24 hours

* Inspect drift and water carryover


6. Bac Cooling Tower Maintenance And Repair Safety Considerations


* Lockout/tagout (LOTO)

* Fall protection

* Confined space precautions

* Chemical handling procedures

* Never enter tower with fan running


7. When to Consider Major Refurbishment


* Cooling capacity loss >10%

* Frequent fan or motor failures

* Excessive water consumption

* Structural corrosion

* Obsolete parts unavailable


8. BAC OEM vs Aftermarket Parts


* OEM BAC parts: guaranteed fit and performance

* Aftermarket: lower cost but must match airflow, drift, and distribution specs exactly


9. Recommended Documentation


* BAC Installation, Operation & Maintenance (IOM) manual

* Motor & gearbox manuals

* Water treatment reports

* Maintenance log




CONTACT US
Consult Your Cooling Tower Expert
Cooling Tower Parts
COOLING TOWER PARTS SUPPLIER
OEM Brands
Quick Links
COOLING TOWER PARTS SUPPLIER
Cooling Tower Parts
OEM Brands
Quick Links
COPYRIGHT © 2024 ZHEJIANG AOSHUAI REFRIGERATION CO., LTD. ALL RIGHTS RESERVED.