BAC (Baltimore Aircoil Company) cooling tower maintenance and repair is essential to keep thermal performance, minimize downtime, and extend equipment life. Below is a practical, field-oriented guide aligned with BAC crossflow and counterflow towers.
* Check cold-water basin level
* Inspect for unusual noise or vibration
* Verify fan motor amps (compare to nameplate)
* Observe water distribution (no dry fill areas)
* Inspect spray nozzles / distribution deck
* Check make-up water valve operation
* Inspect drift eliminators for damage or gaps
* Look for visible corrosion or leaks
* Clean basin strainers
* Inspect fan blades for cracks or fouling
* Check gearbox oil level & condition
* Verify vibration levels at motor and gearbox
* Inspect fill for scaling or biological growth
* Lubricate:
* Motor bearings
* Fan shaft bearings (if applicable)
* Check fan blade pitch angle
* Inspect couplings and alignment
* Test motor insulation resistance (megger)
* Drain and clean cold-water basin
* Remove and clean spray nozzles
* Inspect distribution deck panels
* Inspect drift eliminators thoroughly
* Check gearbox oil (change if contaminated)
* Inspect structural members and casing
* Verify tower performance vs design
Common issues:
* Clogged nozzles
* Uneven water flow
* Deck sagging (crossflow)
Repair actions:
* Replace damaged nozzles
* Level distribution deck panels
* Maintain correct basin water depth
Problems:
* Scaling
* Biofouling
* Brittleness (UV/age)
Solutions:
* Chemical cleaning (with water treatment vendor)
* Partial or full fill replacement
* Upgrade to higher-efficiency BAC-compatible fill
Failure signs:
* Excessive water carryover
* Cracked or warped blades
Repair:
* Replace entire panel sections
* Ensure tight sealing to prevent air bypass
Fan
* Check blade balance and pitch
* Clean fouling to prevent vibration
Gearbox
* Use manufacturer-approved oil
* Watch for oil leaks and temperature rise
Motor
* Ensure space heaters operate
* Replace corroded conduit fittings
* Verify VFD parameters if installed
| Repair Type | Typical Interval |
| Nozzle replacement | 2–5 years |
| Drift eliminator replacement | 8–15 years |
| Fill replacement | 5–12 years |
| Gearbox overhaul | 8–15 years |
| Fan motor replacement | 10–20 years |
| Basin re-coating | s required |
Proper water chemistry prevents 80% of mechanical failures.
Key control items:
* Scaling index (LSI)
* Biological growth
* Corrosion inhibitors
* Blowdown control
* Side-stream filtration (recommended)
Before Shutdown
* Record motor amps, vibration, temperatures
* Photograph blade pitch and component positions
During Repair
* Use OEM or BAC-approved equivalent parts
* Replace fasteners with stainless steel
* Maintain original airflow and water distribution geometry
Start-Up
* Verify rotation direction
* Check fan blade pitch
* Monitor amps, vibration, noise for first 24 hours
* Inspect drift and water carryover
* Lockout/tagout (LOTO)
* Fall protection
* Confined space precautions
* Chemical handling procedures
* Never enter tower with fan running
* Cooling capacity loss >10%
* Frequent fan or motor failures
* Excessive water consumption
* Structural corrosion
* Obsolete parts unavailable
* OEM BAC parts: guaranteed fit and performance
* Aftermarket: lower cost but must match airflow, drift, and distribution specs exactly
* BAC Installation, Operation & Maintenance (IOM) manual
* Motor & gearbox manuals
* Water treatment reports
* Maintenance log
Top Suppliers of Cooling Tower Parts for Power Station China
Top 5 Cooling Tower Drift Eliminator Manufacturer in South Korea
Top 5 Cooling Tower Drift Eliminator Manufacturer in Thailand
Top 5 Cooling Tower Drift Eliminator Manufacturer in Singapore
Top 5 Cooling Tower Drift Eliminator Manufacturer in Vietnam
Cooling Tower Fill | Cooling Tower Fan | Cooling Tower Speed Reduer | Cooling Tower Motor | Cooling Tower Drift Eliminator | Cooling Tower Fan Stacks | Cooling Tower Sprinkler Head | Cooling Tower Air Inlet Louver | Cooling Tower Basin | Cooling Tower Casing | Cooling Tower Nozzle | Cooling Tower Spray Pan | Cooling Tower Plastic Accessories
Marley/Spx | Liang Chi | Kingsun | EBABA/Shinwa | Spindle | Kuken | BAC | Brentwood | Evapco | Royden
HOME | PRODUCTS | OEM BRANDS | ABOUT US | BLOG | FAQ | CONTACT US
Cooling Tower Fill Cooling Tower Fan Cooling Tower Speed Reduer Cooling Tower Motor Cooling Tower Drift Eliminator Cooling Tower Fan Stacks Cooling Tower Sprinkler Head Cooling Tower Air Inlet Louver Cooling Tower Basin Cooling Tower Casing Cooling Tower Nozzle Cooling Tower Spray Pan Cooling Tower Plastic Accessories